Delhi unveils ambitious Urban Mobility Vision: Luxury Metro Coaches, New Tunnels and Pod Taxi
Qatar approves Saudi Rail Link Agreement, Accelerating Gulf Railway Vision 2030
UP Govt plans to introduce Water Metro services in Ayodhya, Varanasi & Prayagraj
India’s First Urban Ropeway begins Trial Run in Varanasi, Set to carry 1 Lakh passengers daily
India and Bhutan to Build First-Ever Rail Link: ₹4,033 Cr Project to Boost Regional Connectivity
Patna to launch Eco-Friendly Water Metro; Trial Run soon between Digha and Kangan Ghats
Air India Group set to launch Flights Operations from Navi Mumbai International Airport
Chennai to launch 25-Year Mobility Plan with Unified QR Ticketing and One-App Transit System
Kochi Metro bags ₹4.4 crore contract to prepare DPR for Mumbai Water Metro Proejct
Navi Mumbai International Airport set for September launch; IndiGo and Akasa Air to lead Operations
Gurugram (Urban Transport News): Single Packet e-Tendering System tender invited from eligible contractors of Railways, CPWD, MES, DOT, RITES, State PWD or any other Central / State Government Undertaking, Municipal Body, Autonomous Body of Central/State Governments or Public Ltd., Companies listed on Stock Exchange in India or Abroad or subsidiaries of such companies for geotechnical investigation works of RRTS.
Detailed geotechnical investigation work for Dharuhera-SNB (Three Packages) of RRTS Package. The work includes drilling of vertical Boreholes of depths up to 45m in general, conducting in-situ permeability test in soil, rock & overburden from the existing ground surface, to determine the in-situ engineering properties, conducting laboratory test on soil and rock samples and submission of final reports in soft copy & hard copy (3 set) after incorporating RITES observations on draft report/data.
One similar work of Minimum value of 80% of the Estimated Cost of work of respective package. Or Two Similar Works each of Minimum value of 50% of the Estimated Cost of work of respective package. Or Three similar works each of Minimum Value of 40% of the Estimated Cost of work of respective package.