GMRC floats tender for Topographical Survey work of Surat Metro rail project

Naomi Pandya Posted on: 2019-08-30 07:26:18 Viewer: 1,339 Comments: 0 Country: India City: Surat

GMRC floats tender for Topographical Survey work of Surat Metro rail project

Gandhinagar (Urban Transport News): The Gujarat Metro Rail Corporation (GMRC) Limited invites Open Tenders from eligible firms for carrying out the topographical survey work for Surat Metro Rail project as details given below:-

NIT No.: GMRC/Topographical Survey/PH-1/2019

Scope of Work:

Detailed Topographical Survey work using total station/DGPS & Drone from Sardhana to Dream City under Surat Metro Rail project, Phase -1.

Important Points

  • Estimated Tender Value: INR 28.77 Lakh
  • Tender Document Fee: INR 5000.00
  • Tender Security/Earnest Money Deposit (EMD): INR 57,000.00
  • Work Completion Period: 120 days (4 months)
  • Availability of Tender Documents: From 28.08.2019 to 19.09.2019 (up to 15.00 hrs)
  • Last Date of Submission of Tender (Online): 19.09.2019 (up to 15.00 hrs)
  • Opening Date of Technical Bid: 19.09.2019 at 15.30 hrs.

Minimum Eligibility Criteria

Work Experience:

The Tenderers will be qualified only if they have successfully completed work(s) during the last seven years ending 31.07.2019 at least one similar work of Rs. 23.02 Lakh or more or two similar works of Rs. 14.39 Lakh or more or three similar works of Rs. 11.51 Lakh or more. “Similar works” means “Topographical Survey” work using total Station/DGPS for any Railway/Metro Project. Tenderer must have carried out at least two works of Drone Survey/Mapping for Railway/Metro/Highway Project during the last seven years ending 31.07.2019.

Financial Standings:

  • Minimum Cash Flow: The Tenders should have a minimum cash flow of INR 8.63 Lakh.
  • Profitability: Profit before Tax should be positive in at least two years, out of the last five audited financial years.
  • Net worth: The net worth of tenderer during the last audited financial year should be >INR 17.26 Lakh.
  • Annual Turnover: The average annual turnover from survey works of the last five financial years should be > INR 69.05 Lakh.

Contact Point

Senior Deputy General Manager- Civil & Procurement Gujarat Metro Rail Corporation (GMRC) Limited Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A, Gandhinagar-382010, Gujarat, India





Also Read




Leave Your Comment!









Recent Comments!

No comments found...!